NoraLEE | USP&E is a development company with Australian and American shareholders with an energy sector development mandate for Sri Lanka.
Our professional services include:
Project Development and Debt/Equity Financing Arrangement
Engineering – site surveys, full spectrum electrical, civil and mechanical engineering
Procurement – equipment inspections and testing
Construction – development and design, commissioning, and start-up
We’ve carried out EPC in Guinea, Mali, Ghana, South Africa, Tanzania, Guatemala, the USA, and Sierra Leone for leading companies. Our shareholders have significant mining and industrial interests in Sri Lanka. NoraLee | USP&E was formed to meet the growing needs of the Ceylon Electricity Board and the MOE of Sri Lanka.
We have strategic partnerships with all leading renewable and heavy industry power equipment manufacturers.
We can gauge your project and produce expert Bankable Feasibility Studies, and through these strategic partnerships supply the best equipment for our client’s projects.
Please get in touch with us today! If you’re looking for good results with power plant specialists in EPC, USP&E Africa is globally respected and trusted stop. If you would like to know more about our Engineering, Procurement and Construction Service, give us a call +27 (0)22 510-0012. Or email us at info@uspowerco.com and lets discuss your project. USP&E Africa is the global power plant solutions provider for you.Also, check out www.uspowerco.com. If your company or company’s project is not in South Africa, we have strategic offices in other locations, just click here to view.
USP&E HOTLIST 2019
- New Surplus 750MW Combined Cycle Gas Turbine
- 254 MW SIEMENS FIAT Gas Turbine Power Station for $14m Low Hrs!
- 1500.0 MW 2011 GE Frame 9F Natural Gas Generator. 50 Hz, Natural Gas Based Combined Cycle Power Plant ….
- 750.0 MW 2011 GE Frame 9F Natural Gas Generator. 50 Hz, 3 x 750 MW Natural Gas Based Combined Cycle…
- 470.0 MW 1992 2 Siemens 94.2-124 MW + 4 Alstom -GE Frame 9B Natural Gas Generator. 50 Hz, 1: (2 Siemens 94.2-124 MW + 1 Alstom -GE Frame…
- 440.0 MW 2013 Natural Gas Generator. 50 Hz, NEW UNUSED EXCLUSIVE CCGT – Combined Cycle…
- 300.0 MW 2015 SGT5 4000F Natural Gas Generator. 50 Hz, EXCLUSIVE 300MW Siemens SGT5 4000F Gas Turbine…
- 254.0 MW 1998 TG50 D5 Natural Gas Generator. 50 Hz, TWO (2) SIEMENS WESTINGHOUSE W701DS GAS TURBINE…
- 81.0 MW 2011 PG6111 Natural Gas Generator. 50 Hz, Unused 81MW Gas Turbine Geneset Turbine and…
- 32.0 MW 2018 MAN 18V32/40 CD HFO Generator. No Enclosure, 50 Hz, Generator size: 32MW HFO Engine model: 8MW…
- 30.0 MW 2018 KTA50G3 Diesel Generator. 60 Hz, 30 MW 40 x GENSET POWERED BY CUMMINS DIESEL…
- 14.1 MW 2013 L20’s Generator. 50 Hz, 2 x 6L20 1110kw Engines Driving AVK Alternators…
Email Us Today for these GREAT DEALS! Guaranteed response within 2 hours!!
Privacy · FCPA & OFAC Compliance
