About USP&E Renewables: Feasibility to Full EPC

Renewable EPC

About USP&E Renewables: From Feasibility to Full-Scope EPC

Your renewable project depends on decisions made long before construction: site selection, resource assessment, grid route and design. Weak early work leads to redesign, permit delays and plants that underperform.

You need a partner that covers the early stages as carefully as the build.

Renewables From the Ground Up

We support renewable projects from the first study through to operation. USP&E covers pre-construction, engineering and full-scope EPC. USP&E is a full-service EPC and O&M contractor, not a broker.

Pre-Construction and Feasibility

Pre-construction work includes feasibility studies, site surveys, geotechnical and topographic analysis, solar resource assessment, grid connection studies and permitting support. These studies set the project’s real capacity, cost and schedule.

For hybrid plants, feasibility also sizes storage and thermal backup, so firm capacity is part of the plan from the start.

Full-Scope EPC

USP&E’s EPC scope covers civil works, structures, solar arrays, inverters, storage, electrical systems, substations, thermal backup and controls. Everything is commissioned as one plant, then handed over or operated by USP&E.

Solar delivery is also supported by solar EPC delivery, and backup turbines by gas turbines for renewable firming.

Our Offices

Colorado Springs (1755 Telstar Dr, Suite 300) and Knoxville (800 S Gay St, Suite 700) lead US work on renewable project delivery, from site walk-downs to commissioning sign-off. Ask the Cape Town or Colorado Springs team about feasibility support for your site. London (162-168 Regent Street) supports structuring and finance conversations, Johannesburg (22 Kildoon Rd, Bryanston) and Cape Town (31 Brickfield Road, Woodstock) carry African delivery, and Wuxi (No. 1, Ningzhou Road, Wuxi) covers China supply chain and manufacturing. Regions: USA | AFRICA | UK | UAE | CHINA. The record is 150+ power projects in 45+ countries and 25,000 MW contracted since 2002, run by 400+ engineers and project managers. ISO 9001 and ISO 45001 certified.

Delivery Record

Our renewable work is backed by thermal and turbine projects like these.

  • USP&E has refurbished seven GE Frame 6B gas turbines to zero hours in-house for major US hyperscale data-centre developers.
  • NEOM, Saudi Arabia: USP&E supplied three zero-hour Siemens SGT-400 gas turbines. Read the case study.
  • Kinross Gold, Mauritania: USP&E engineered and executed Caterpillar power station backup for a large-scale mining operation. Read the case study.

Working With USP&E

Your 3-step plan: 1. Share your site and project goals. 2. Agree feasibility and survey scope. 3. Move into EPC with the same team.

  1. Share site details.
  2. Agree studies needed.
  3. Complete feasibility.
  4. Finalise design.
  5. Deliver EPC.

Resources

EPC · O&M · About USP&E · Case studies · Contact · Inventory · Power plant EPC.

FAQ: Renewables EPC scope

What pre-construction services does USP&E offer?

USP&E offers feasibility studies, site surveys, geotechnical and topographic analysis, solar resource assessment, grid connection studies and permitting support for renewable projects.

What does USP&E’s renewable EPC include?

USP&E’s renewable EPC includes civil works, structures, solar arrays, inverters, storage, electrical systems, substations, thermal backup and controls, commissioned as one plant.

Does USP&E design hybrid plants?

Yes. USP&E sizes solar, storage and thermal backup together during feasibility so firm capacity is built into the design from the start.

Is USP&E a broker?

No. USP&E is a full-service EPC and O&M contractor, not a broker. We carry projects from studies through construction and into operation.

How large is USP&E’s track record?

USP&E has delivered 150+ power projects in 45+ countries, with 25,000 MW contracted since 2002, and is ISO 9001 and ISO 45001 certified.

Take the Next Step With USP&E

The good outcome is simple: renewable project delivery with one accountable team and no surprises at commissioning. The bad one is a half-finished package nobody owns. Contact USP&E, phone +27 10 822 2324 or email info@uspeglobal.com, or search inventory now.

SEARCH INVENTORY

Powering Possibility. Built for the Frontier.


Where we operate

USA | AFRICA | UK | UAE | CHINA

USP&E United States

Colorado Springs Office: 1755 Telstar Dr, Suite 300

Knoxville Office: 800 S Gay St, Suite 700

USP&E South Africa

Johannesburg Office: 22 Kildoon Rd, Bryanston

Cape Town Office: 31 Brickfield Road, Woodstock

USP&E United Kingdom

London Office: 162-168 Regent Street

USP&E China

China Office: No. 1, Ningzhou Road, Wuxi

Call:+27 10 822 2324  |  E:info@uspeglobal.com

ISO Certifications
ISO9001ISO45001

Powering Possibility. Built for the Frontier.
Full-service EPC & O&M. Not a broker.

© 2026 USP&E · Renewable EPC is part of USP&E