Meet the USP&E Renewable EPC and O&M Team

Renewable EPC

Meet the USP&E Renewable EPC and O&M Team

You want to know who will actually design, build and run your plant. Behind many websites sits a small sales team and a list of subcontractors, and that is not who you want responsible for your power.

Here is how the USP&E team is organised and how you will work with it.

Engineers, Project Managers and Operators

Our team includes 400+ engineers and project managers, plus operators and technicians on live plants. USP&E staffs each project with the disciplines it needs. USP&E is a full-service EPC and O&M contractor, not a broker.

How Our Team Is Organised

Project teams bring together electrical, mechanical, civil and controls engineers, renewable and thermal specialists, procurement and logistics staff, construction managers and commissioning engineers. After handover, O&M teams of operators and technicians take over, often including people who commissioned the plant.

Each project has a single project manager responsible for scope, cost, schedule and quality, with clear lines to our leadership. You can read about the company’s leadership on the USP&E core leadership page.

Where Our People Work

Our people work from six offices and on project sites across 45+ countries. Teams combine local knowledge with experience from frontier markets, and they work under ISO 9001 and ISO 45001 certified systems.

Solar delivery is supported by our sister team for solar EPC delivery.

Our Offices

Colorado Springs (1755 Telstar Dr, Suite 300) is where many renewable and hybrid projects requests are scoped; Knoxville (800 S Gay St, Suite 700) follows them into procurement and field execution. Arrange a meeting at any office to meet the team that would lead your project. Cape Town (31 Brickfield Road, Woodstock) and Johannesburg (22 Kildoon Rd, Bryanston) contribute site teams that have worked in heat and dust, London (162-168 Regent Street) handles finance-facing work, and Wuxi (No. 1, Ningzhou Road, Wuxi) keeps manufactured components moving. Regions served: USA | AFRICA | UK | UAE | CHINA. USP&E has delivered 150+ power projects in 45+ countries, with 25,000 MW contracted since 2002, and is ISO 9001 and ISO 45001 certified.

What Our Team Has Delivered

The team’s work speaks for itself.

  • USP&E has refurbished seven GE Frame 6B gas turbines to zero hours in-house for major US hyperscale data-centre developers.
  • NEOM, Saudi Arabia: USP&E supplied three zero-hour Siemens SGT-400 gas turbines. Read the case study.
  • USP&E supplied 28 Cummins KTA50 containerised diesel gensets, 1,275 kVA each, for Perseus Mining’s Nyanzaga Gold Project in Tanzania.

Working With Our Team

Your 3-step plan: 1. Tell us about your project. 2. Meet the proposed project team. 3. Agree scope and start work.

  1. Get in touch.
  2. Share your project needs.
  3. Meet the project team.
  4. Agree scope.
  5. Start delivery.

Resources

EPC · O&M · About USP&E · Case studies · Contact · Inventory · Power plant EPC.

FAQ: USP&E team

How large is the USP&E team?

USP&E has 400+ engineers and project managers, plus operators and technicians working on live plants across 45+ countries. Each project is staffed with the disciplines it needs, from design to O&M.

Who will manage my project?

USP&E assigns a single project manager responsible for scope, cost, schedule and quality, supported by engineering, procurement, construction and commissioning specialists.

Does the same team stay after commissioning?

USP&E often keeps commissioning engineers involved as plants move into O&M, so knowledge of the plant stays with the people who run it.

Is USP&E a broker?

No. USP&E is a full-service EPC and O&M contractor, not a broker. Our own people design, build and operate the plants we deliver.

Where does the USP&E team work from?

USP&E’s team works from Colorado Springs, Knoxville, London, Johannesburg, Cape Town and Wuxi, and on project sites around the world.

Take the Next Step With USP&E

Success looks like renewable and hybrid projects that is scoped, delivered and running on your date. Failure looks like months lost to a seller who disappears after the invoice. Talk to USP&E at our contact page, call +27 10 822 2324 or email info@uspeglobal.com, and browse live stock on the USP&E inventory.

SEARCH INVENTORY

Powering Possibility. Built for the Frontier.


Where we operate

USA | AFRICA | UK | UAE | CHINA

USP&E United States

Colorado Springs Office: 1755 Telstar Dr, Suite 300

Knoxville Office: 800 S Gay St, Suite 700

USP&E South Africa

Johannesburg Office: 22 Kildoon Rd, Bryanston

Cape Town Office: 31 Brickfield Road, Woodstock

USP&E United Kingdom

London Office: 162-168 Regent Street

USP&E China

China Office: No. 1, Ningzhou Road, Wuxi

Call:+27 10 822 2324  |  E:info@uspeglobal.com

ISO Certifications
ISO9001ISO45001

Powering Possibility. Built for the Frontier.
Full-service EPC & O&M. Not a broker.

© 2026 USP&E · Renewable EPC is part of USP&E