The new FX-45 gives you a defined modular gas turbine to plan into your projects now.
A Turbine to Plan Around
We give renewable developers a clear thermal option to include in their plans. USP&E offers the new FX-45 with EPC and O&M under one contract. USP&E is a full-service EPC and O&M contractor, not a broker.
What the New FX-45 Offers
The New USP&E FX-45 45MW Modular Gas Turbine for the Hyperscale Data Center sector in the USA is a 45MW modular unit for 50 Hz and 60 Hz systems, with capacity slots from 2028 to 2030. Its modular design suits projects that add capacity in phases.
Project-specific technical information is provided to qualified buyers during scoping.
Including FX-45 in Project Planning
Developers can include FX-45 capacity in feasibility studies, offtake discussions and financing models, knowing the unit size and slot window. USP&E supports with layout, fuel supply planning, grid connection studies and schedule.
Where projects are solar-led, our sister team supports solar EPC delivery. For African mining hybrids, see hybrid power for African mining.
EPC and O&M Around the Turbine
USP&E delivers FX-45 units as part of complete plants: foundations, fuel gas systems, electrical integration, controls and commissioning, followed by long-term O&M.
That gives developers and lenders one accountable contractor for the thermal side of the hybrid.
USP&E Offices for FX-45 Enquiries
Colorado Springs (1755 Telstar Dr, Suite 300) and Knoxville (800 S Gay St, Suite 700) lead US work on the new FX-45 for renewable developers, from site walk-downs to commissioning sign-off. Renewable developers often begin FX-45 discussions with our Knoxville team before involving London on financing. London (162-168 Regent Street) supports structuring and finance conversations, Johannesburg (22 Kildoon Rd, Bryanston) and Cape Town (31 Brickfield Road, Woodstock) carry African delivery, and Wuxi (No. 1, Ningzhou Road, Wuxi) covers China supply chain and manufacturing. USA | AFRICA | UK | UAE | CHINA. Behind that footprint sit 150+ power projects in 45+ countries, 25,000 MW contracted since 2002, and ISO 9001 and ISO 45001 certified management systems.
Delivery Record Behind the FX-45
You need a contractor with turbine experience. Here is part of ours.
- USP&E has refurbished seven GE Frame 6B gas turbines to zero hours in-house for major US hyperscale data-centre developers.
- NEOM, Saudi Arabia: USP&E supplied three zero-hour Siemens SGT-400 gas turbines. Read the case study.
- Barrick Gold, Mali: USP&E refurbished and supported a 104 MW mining power station. Read the case study.
Your Plan
Your 3-step plan: 1. Share your project timeline and capacity need. 2. Include FX-45 blocks in your plan with USP&E support. 3. Reserve slots and contract EPC and O&M.
- Define project phases and firm capacity.
- Confirm gas supply and grid route.
- Add FX-45 blocks to feasibility and finance models.
- Reserve slots.
- Contract EPC and O&M.
Resources
EPC · O&M · About USP&E · Case studies · Contact · Inventory · Gas turbine inventory.
FAQ: FX-45 modular gas turbines
What is the new FX-45?
USP&E’s new FX-45 is the New USP&E FX-45 45MW Modular Gas Turbine for the Hyperscale Data Center sector in the USA, available for 50 Hz and 60 Hz systems with capacity slots from 2028 to 2030.
Why would a renewable developer use the FX-45?
USP&E sees developers using the FX-45 to provide firm capacity behind solar and storage, supporting offtake terms and financing by showing power will be available when renewables fall short.
Can I include FX-45 in financing models?
Yes. USP&E supports developers with unit size, slot timing, layout, fuel and grid planning so FX-45 capacity can be included in feasibility studies and financing models.
Does USP&E provide EPC for the FX-45?
Yes. USP&E delivers FX-45 units within complete plants, including foundations, fuel gas systems, electrical integration, controls and commissioning, followed by O&M.
Is USP&E a broker?
No. USP&E is a full-service EPC and O&M contractor, not a broker. We supply, build and operate the plants that include FX-45 units.
Are FX-45 technical details public?
USP&E shares project-specific technical information with qualified buyers during scoping. Public information covers the 45MW modular unit, 50 Hz and 60 Hz options and 2028 to 2030 slots.
Which offices handle FX-45 enquiries?
USP&E handles FX-45 enquiries from Colorado Springs and Knoxville in the USA, London for finance, Johannesburg and Cape Town in South Africa and Wuxi for manufacturing support.
What turbine projects has USP&E delivered?
USP&E has refurbished seven GE Frame 6B gas turbines to zero hours in-house for major US hyperscale data-centre developers and supplied three zero-hour Siemens SGT-400 units for NEOM.
Take the Next Step With USP&E
Done well, the new FX-45 for renewable developers turns into steady output and clean records. Done badly, it becomes a stranded asset and a dispute. Call USP&E on +27 10 822 2324, email info@uspeglobal.com or use the contact page; stock is listed on the inventory hub.