Renewable, Hybrid and Turbine EPC Brochures

Renewable EPC

Renewable, Hybrid and Turbine EPC Brochures

You need to explain a hybrid power plan to investors, offtakers or a board, and they will ask how renewables and backup work together. Generic solar brochures do not answer those questions.

You need documents that cover the whole hybrid plant, with engineers ready to follow up.

Documents for Hybrid Decisions

We prepare brochures that cover renewables and the firm capacity behind them. USP&E sends them directly with notes relevant to your project. USP&E is a full-service EPC and O&M contractor, not a broker.

Brochures Available

Each brochure covers one part of the hybrid decision, from overall approach to specific equipment and services. Equipment availability is confirmed when the brochure is sent.

  • Renewable and hybrid EPC: solar, storage and thermal backup engineered as one plant.
  • Thermal firming options: diesel, gas engines and gas turbines for hybrids.
  • Used and new gas turbines, including remanufactured GE Frame 6B packages.
  • The new FX-45: New USP&E FX-45 45MW Modular Gas Turbine for the Hyperscale Data Center sector in the USA, slots from 2028 to 2030.
  • EPC risk management and project controls.
  • Hybrid plant operations and maintenance.

Using the Brochures

Share the brochures with your team and stakeholders, then bring load, site and fuel data to a scoping call. An engineer will turn the general approach into a project-specific design.

Solar-focused buyers can also visit our sister team for solar EPC delivery.

Where Brochure Requests Are Handled

Colorado Springs (1755 Telstar Dr, Suite 300) is where many renewable and hybrid brochure requests requests are scoped; Knoxville (800 S Gay St, Suite 700) follows them into procurement and field execution. The office nearest your project sends the brochures and handles follow-up questions. Cape Town (31 Brickfield Road, Woodstock) and Johannesburg (22 Kildoon Rd, Bryanston) contribute site teams that have worked in heat and dust, London (162-168 Regent Street) handles finance-facing work, and Wuxi (No. 1, Ningzhou Road, Wuxi) keeps manufactured components moving. Regions served: USA | AFRICA | UK | UAE | CHINA. USP&E has delivered 150+ power projects in 45+ countries, with 25,000 MW contracted since 2002, and is ISO 9001 and ISO 45001 certified.

Projects Behind Our Brochures

Our documents draw on delivered work like this.

  • USP&E has refurbished seven GE Frame 6B gas turbines to zero hours in-house for major US hyperscale data-centre developers.
  • NEOM, Saudi Arabia: USP&E supplied three zero-hour Siemens SGT-400 gas turbines. Read the case study.
  • Kinross Gold, Mauritania: USP&E engineered and executed Caterpillar power station backup for a large-scale mining operation. Read the case study.

How to Request Brochures

Your 3-step plan: 1. Choose the brochures you need. 2. Receive them from a USP&E engineer. 3. Book a hybrid scoping call.

  1. Select brochure topics.
  2. Send your details via the contact page.
  3. Receive documents from an engineer.
  4. Review with stakeholders.
  5. Book a scoping call.

Resources

EPC · O&M · About USP&E · Case studies · Contact · Inventory · Power plant EPC.

FAQ: Renewable EPC brochures

Which brochures does USP&E offer for renewable projects?

USP&E offers brochures on renewable and hybrid EPC, thermal firming options, used and new gas turbines, the new FX-45, EPC risk management and hybrid plant operations and maintenance.

Why are brochures sent rather than downloaded?

USP&E sends brochures directly so an engineer can confirm current equipment availability and add notes relevant to your project, which helps the next conversation start from your needs.

Do the brochures cover backup power?

Yes. USP&E’s brochures explain how diesel, gas engines and gas turbines provide firm capacity behind solar and storage in hybrid plants.

Is USP&E a broker?

No. USP&E is a full-service EPC and O&M contractor, not a broker. The brochures describe plants we design, build and operate.

Which office will send the brochures?

USP&E sends brochures from the office nearest your project, whether Colorado Springs, Knoxville, London, Johannesburg, Cape Town or Wuxi, so local follow-up questions are answered by the same team.

Take the Next Step With USP&E

Success looks like renewable and hybrid brochure requests that is scoped, delivered and running on your date. Failure looks like months lost to a seller who disappears after the invoice. Talk to USP&E at our contact page, call +27 10 822 2324 or email info@uspeglobal.com, and browse live stock on the USP&E inventory.

SEARCH INVENTORY

Powering Possibility. Built for the Frontier.


Where we operate

USA | AFRICA | UK | UAE | CHINA

USP&E United States

Colorado Springs Office: 1755 Telstar Dr, Suite 300

Knoxville Office: 800 S Gay St, Suite 700

USP&E South Africa

Johannesburg Office: 22 Kildoon Rd, Bryanston

Cape Town Office: 31 Brickfield Road, Woodstock

USP&E United Kingdom

London Office: 162-168 Regent Street

USP&E China

China Office: No. 1, Ningzhou Road, Wuxi

Call:+27 10 822 2324  |  E:info@uspeglobal.com

ISO Certifications
ISO9001ISO45001

Powering Possibility. Built for the Frontier.
Full-service EPC & O&M. Not a broker.

© 2026 USP&E · Renewable EPC is part of USP&E