This page sets out what that EPC scope normally includes, phase by phase.
Feasibility and concept
The first phase defines the load profile, the gas supply and the grid situation, and compares plant options. For hybrid projects it also models how the engines will work with solar, wind and batteries: how often they start, how deep they cycle and how much fuel they burn.
A good concept fixes the number and size of engines, the electrical arrangement and the space needed for future units.
Engine selection and procurement
Engine choice depends on the unit size, fuel gas quality, efficiency, emissions limits, start time and the support available locally. Long-lead items such as engines, alternators, transformers and switchgear are ordered early, often before all detailed design is complete.
Gas quality, including methane number and contaminants, must be confirmed before ordering, since it affects the engine rating.
Gas supply and balance of plant
The EPC scope normally includes the gas reception station with metering, pressure regulation and filtering, plus the cooling system, lube oil storage, compressed air, exhaust stacks, fire protection, control room and buildings.
Where gas supply is not firm, a backup fuel or a battery and solar layer can cover interruptions. Our page on gas engine stations in hybrid plants explains that role.
Grid connection and controls
The plant connects through a step-up substation to the grid or the site network. Studies cover load flow, short circuit, protection and grid code compliance. In hybrid plants, a plant controller dispatches engines, inverters and batteries together.
Our article on grid code for hybrid interconnection covers the requirements in more depth.
Construction and commissioning
Construction includes civil works, engine foundations, mechanical and electrical installation, and pre-commissioning checks. Commissioning tests each engine, then the plant as a whole, ending with performance and reliability tests that confirm the contract guarantees.
Because engine plants are modular, units can be commissioned in stages, giving the owner early power.
Contract structure and risk
Gas engine EPC contracts usually carry guarantees on output, heat rate, emissions and completion date, with liquidated damages if they are missed. In hybrid projects, guarantees may also cover the performance of the combined plant, such as fuel saved or availability of firm capacity.
Clear interfaces matter most where several contractors are involved, for example a separate solar EPC or a gas pipeline owner. A single EPC contractor for the full hybrid plant removes many of those interfaces and gives the owner one point of responsibility.
Handover and O&M
A complete EPC delivery hands over drawings, manuals, spares and trained staff. Many owners also contract the EPC company to operate and maintain the plant, which keeps responsibility for performance with the same team that built it.
About USP&E
USP&E delivers gas engine, gas turbine, HFO and hybrid power plants as an EPC and O&M contractor, not a broker. Our record is 150+ power projects in 45+ countries, 25,000 MW contracted since 2002 and 24+ years in the field, under ISO 9001 and ISO 45001. Learn more on our hybrid power plant page.
Offices: Colorado Springs (1755 Telstar Dr, Suite 300), Knoxville (800 S Gay St, Suite 700), London (162-168 Regent Street), Johannesburg (22 Kildoon Rd, Bryanston), Cape Town (31 Brickfield Road, Woodstock) and China (No. 1 Ningzhou Road, Wuxi). Regions: USA | AFRICA | UK | UAE | CHINA. ISO 9001 and ISO 45001 certified.
Questions about gas engine plant EPC
What does a gas engine power plant EPC include?
Feasibility and design, engine and equipment procurement, gas supply, balance of plant, grid connection, construction, commissioning and handover.
Why choose gas engines for a hybrid plant?
They start quickly, run well at part load and can cover gaps when solar or wind output drops.
Can gas engine plants be built in stages?
Yes. Their modular design lets units be added and commissioned in steps.
Should the EPC contractor also run the plant?
It is often a good idea, because the same team that built the plant then stands behind its performance.
Planning a gas engine or hybrid plant?
Share the load profile, gas supply details and any renewable plans, and we will outline an EPC scope and plant concept.
Phone +27 10 822 2324, email info@uspeglobal.com with your site data, or go through the EPC enquiry form. Engines and generating equipment are listed on the USP&E inventory hub.
