Contact Us | Renewable EPC

Renewable EPC

Plan a renewable or hybrid project with us

Solar, wind, storage and firm power: describe the site and the grid, and an engineer will respond with a route to delivery.

From first sketch to running plant

Developers and industrial owners reach us when a renewable project needs a delivery partner who also understands firm power. USP&E engineers design hybrid plants that pair solar and storage with thermal generation, then build and operate them.

For thermal units to firm your plant, look at the USP&E inventory.

Get in touch

What to share first

  • Site location and the land available.
  • Solar, wind or storage capacity targets.
  • The grid connection and what it can export.
  • How much firm power the offtaker needs.
  • Your schedule for financing and construction.

Useful reading before you write

Our offices

USP&E works from six offices in the USA, the UK, South Africa and China, and is certified to ISO 9001 and ISO 45001.

Colorado Springs

1755 Telstar Dr, Suite 300, Colorado Springs, USA

Knoxville

800 S Gay St, Suite 700, Knoxville, USA

London

162-168 Regent Street, London, UK

Johannesburg

22 Kildoon Rd, Bryanston, South Africa

Cape Town

31 Brickfield Road, Woodstock, South Africa

China

No. 1 Ningzhou Road, Wuxi, China

Certified and accountable

A hybrid plant needs one team that can engineer both sides of it. USP&E brings EPC and O&M together under ISO 9001 and ISO 45001 systems.

ISO9001 & 45001 certified
400+Engineers & project managers
35+Countries with completed utility-scale projects

Have a hybrid project to deliver?

Call +27 10 822 2324 or email info@uspeglobal.com with your site and targets.